Assignment by Raman, 18 Feb 2022, Friday
- Create a JIRA Project with Scrum template and Name it College Hostel
- Create an epic for Managing the Hostel and name it as Hostel Room Management
- Create 2 user stories in the above epic ( Top 1 to 10 floors, Arrange Beds for each room) and assign to a user.
- Create 2 subtasks in "Top 1 to 10 floors" user story
- Arrange each room equipment
- Test all the utilities
- Create 2 subtasks in "Arrange Beds for each room"
- Arrange single Bed
- Arrange Mattress
- Create a sprint for both tasks and change the status form To Do to progress and once the work is completed then it should be "Done"
- Check the Backlogs and Boards for each activity.
No comments:
Post a Comment